• četvrtak, 24 jul 2025

Presentation of so far realized works on Union Bridge

Presentation of so far realized works on Union Bridge
Resutls and dynamics of so far realized works on construction of the bridge #Union bridge# on the river Moraca will be presented tomorrow at the press conference at 11 o#clock on the building site near the Sports Center. It was announced by the European agency for reconstruction (EAR) that representatives of Fund for city construction grounds Nikola Rakocevic representative of contractor Branisa Pilindavic and EAR representatives Nelly Boland and Dragann Mugosa would speak at the conference.