• četvrtak, 24 jul 2025

Winter maintaining of roads finished in Kotor

Winter maintaining of roads finished in Kotor
Kotor#s section of firm Crnagoraput today has finished winter season of road maintaining by repairing holes of percussion on roadway, change of horizontal signalization and taking care of road zone. Engineer Jovan Lipovac said for Mina-business that the firm was withdrawing vehicles from aid station in Cetije to Kotor section in order to adjust them to the way of road maintaining applied after winter. He claimed that due to lack of money this section was currently not very much engaged in road maintaining but it was more engaged in reaping of holes of percussion, cleaning of road zone, taking care of drainage channels and change of horizontal signalization. It was announced from the firm that they would have lots of works on Adriatic highway, that is, covering the road with micro-asphalt, setting of vertical signalization and drawing of horizontal as well as placing of reflective beams. Lipovac said that this work, on part of road from Debeli brijeg to Ulcinj, would be financed by European agency for reconstruction and they were currently looking for the best contractor. Kotor section of Crnagoraput is maintaining 460 km of highway and regional roads and it has 63 permanently employed workers.